The project used the ULTRACHEM Grand KIL chemical mix. It provides reliable sealing along the contact between the host rock and the iron tubbing lining regardless of water mineralisation and ambient temperature.

The works included supply of components, mobilisation of equipment and specialists, commissioning, a demonstration batch for the client, and preparation and delivery of the material into the rock/tubbing cavity, followed by monitoring of its spread.
The client was provided with data sheets for the raw components and test reports for each batch of the prepared mix.
The project achieved the required level of reliability and safety of the shaft structure. This confirms the high professionalism of Parad-Rus LLC specialists and the effectiveness of the technologies used.