Stop water inflow

Active water inflow is first stopped with a rapid-setting compound or a water-reactive polyurethane resin; the rock mass and the space behind the lining are then consolidated by grouting, and the surface waterproofing is restored.
Work stages
- Survey: location and pressure of water ingress, lining condition, chemical composition of the water.
- Instant stopping of point leaks with a water-stop compound.
- Injection of cracks and joints with water-reactive polyurethane resin through packers.
- Grouting of the space behind the lining with microcement-based suspensions with admixtures.
- Penetrating or coating waterproofing of the surface, verification of the result.
Related sections
- Service: construction and installation works
- Service: condition survey
- Technical solutions
- Mining enterprises
- Transport infrastructure
Materials
| Brand | Catalogue application | |
|---|---|---|
| ULTRACEM HYDROACTIVE | Compound for instant water stopping | Product page |
| ULTRACEM HYDROSTOP | Penetrating waterproofing mix | Product page |
| ULTRACHEM GRAND ROCK 311 | Water-reactive two-component polyurethane injection resin | Product page |
| ULTRACHEM GRAND ROCK 310 | Two-component polyurethane injection compound | Product page |
| ULTRACEM MC 10000 | Microcement for grouting | Product page |
Request a calculation or a technical solution
Describe the project and conditions and an engineer will select the material system and work method.