Construction and installation works using our materials
Full construction cycle, from engineering surveys to designer’s field supervision. We build complex and unique facilities with guaranteed quality.

Types of work performed
Shotcreting of shaft and tunnel surfaces
Methods: wet-mix and dry-mix shotcrete.
grouting
- consolidation of unstable rock and soil;
- waterproofing of the rock mass and concrete lining;
- stopping active water inflows;
- drilling/abandonment of boreholes (including freeze holes);
- construction of grout curtains (cut-off curtains);
- filling of voids and cavities to ensure uniform distribution of rock pressure.
Concreting in difficult conditions of underground mines
Our permit to carry out the works is ensured by
Qualified engineering and technical staff experienced in shaft-sinking and tunnelling works and authorised to work at hazardous production facilities.
A fleet of specialised equipment designed for heavy-duty processes.
Established operational and acceptance quality control procedures complying with SP 48.13330.2019 “Organisation of construction”.
An in-house accredited laboratory and technical department that monitor construction parameters and control the properties of the materials used in accordance with GOST ISO/IEC 17025-2019.
Full engineering cycle
Parad-Rus LLC provides full-cycle engineering of construction works for mine shafts, mine workings, tunnels and other underground structures:
The construction division of Parad-Rus LLC is a member of the self-regulatory organisation Association of Smolensk Builders (Reg. No. 890 of 01.04.2024), which confirms that the company meets the requirements for complex construction and installation works, including underground works.
Documents
Quality management system in place.
Membership in a self-regulatory organisation (SRO).
Registered with the Association of Smolensk Builders (SRO).
Order construction and installation works
Contact us to discuss your facility and the scope of works.
Site photos

